• About Us
  • Why Kompas
  • login
  • Sample Course
  • About Us
  • Why Kompas
  • login
  • Sample Course
  • (800) 294-4582

Project Details 7 Final Quiz

Time limit: 0

Quiz Summary

0 of 6 Questions completed

Questions:

Information

You have already completed the quiz before. Hence you can not start it again.

Quiz is loading…

You must sign in or sign up to start the quiz.

You must first complete the following:

Results

Quiz complete. Results are being recorded.

Results

0 of 6 Questions answered correctly

Your time:

Time has elapsed

You have reached 0 of 0 point(s), (0)

Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)

Categories

  1. Not categorized 0%
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  1. Current
  2. Review
  3. Answered
  4. Correct
  5. Incorrect
  1. Question 1 of 6
    1. Question

    The PM can access the FMP calendar from the top of the “Project Details” page.

    Correct
    Incorrect
  2. Question 2 of 6
    2. Question

    Calendar dates can be edited after they have been added and saved to FMP.

    Correct
    Incorrect
  3. Question 3 of 6
    3. Question

    The incentive request and the 1/3 down request can be set for the invoice with one button.

    Correct
    Incorrect
  4. Question 4 of 6
    4. Question

    A PM can assign an action to someone outside of FMP.

    Correct
    Incorrect
  5. Question 5 of 6
    5. Question

    What does a dark green label mean in the calendar?

    Correct
    Incorrect
  6. Question 6 of 6
    6. Question

    You are able to see if a client has paid their incentive in the Advanced Deposit Request section in FMP.

    Correct
    Incorrect

Quick Links

  • About Us
  • My Courses
  • Contact
  • Log Out

Keep In Touch

  • (800) 294-4582
  • [email protected]
Facebook Twitter Linkedin