• About Us
  • Why Kompas
  • login
  • Sample Course
  • About Us
  • Why Kompas
  • login
  • Sample Course
  • (800) 294-4582

Project Details 26 Final Quiz

Time limit: 0

Quiz Summary

0 of 6 Questions completed

Questions:

Information

You have already completed the quiz before. Hence you can not start it again.

Quiz is loading…

You must sign in or sign up to start the quiz.

You must first complete the following:

Results

Quiz complete. Results are being recorded.

Results

0 of 6 Questions answered correctly

Your time:

Time has elapsed

You have reached 0 of 0 point(s), (0)

Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)

Categories

  1. Not categorized 0%
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  1. Current
  2. Review
  3. Answered
  4. Correct
  5. Incorrect
  1. Question 1 of 6
    1. Question

    The PM Feedback section contains the following information:

    Correct
    Incorrect
  2. Question 2 of 6
    2. Question

    The two check boxes for “Posted on Website” (for web comment post) and “Email Blast” (for pre-screener blast) are automatically checked if used by Programming.

    Correct
    Incorrect
  3. Question 3 of 6
    3. Question

    Which of the following is NOT Project Feedback?

    Correct
    Incorrect
  4. Question 4 of 6
    4. Question

    What is the section called where you checkmark all “things” that occurred during your project?

    Correct
    Incorrect
  5. Question 5 of 6
    5. Question

    Project Feedback should be done “when” in the life of a project.

    Correct
    Incorrect
  6. Question 6 of 6
    6. Question

    How is Project Feedback used?

    Correct
    Incorrect

Quick Links

  • About Us
  • My Courses
  • Contact
  • Log Out

Keep In Touch

  • (800) 294-4582
  • [email protected]
Facebook Twitter Linkedin