• About Us
  • Why Kompas
  • login
  • Sample Course
  • About Us
  • Why Kompas
  • login
  • Sample Course
  • (800) 294-4582

Project Details 5 Final Quiz

Time limit: 0

Quiz Summary

0 of 6 Questions completed

Questions:

Information

You have already completed the quiz before. Hence you can not start it again.

Quiz is loading…

You must sign in or sign up to start the quiz.

You must first complete the following:

Results

Quiz complete. Results are being recorded.

Results

0 of 6 Questions answered correctly

Your time:

Time has elapsed

You have reached 0 of 0 point(s), (0)

Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)

Categories

  1. Not categorized 0%
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  1. Current
  2. Review
  3. Answered
  4. Correct
  5. Incorrect
  1. Question 1 of 6
    1. Question

    The number of Recruiting Hours is set by FMP but can be edited if your project is re-scoped.

    Correct
    Incorrect
  2. Question 2 of 6
    2. Question

    The Used Hours will automatically calculate and populate when:

    Correct
    Incorrect
  3. Question 3 of 6
    3. Question

    Research Location is set during bid but can also be selected from a dropdown menu during project set-up.

    Correct
    Incorrect
  4. Question 4 of 6
    4. Question

    Research Type can be:

    Correct
    Incorrect
  5. Question 5 of 6
    5. Question

    # to Recruit is NOT editable.

    Correct
    Incorrect
  6. Question 6 of 6
    6. Question

    Which of the following is NOT an option when setting the Self Schedule Level?

    Correct
    Incorrect

Quick Links

  • About Us
  • My Courses
  • Contact
  • Log Out

Keep In Touch

  • (800) 294-4582
  • [email protected]
Facebook Twitter Linkedin